The work consisted in waterproofing the station structure, the enlargement of the Saint-Urbain entrance, the refurbishment of the mezzanine floor, the construction of elevator shafts as well as the refurbishment of the station’s lighting.
The work consisted in waterproofing the station structure, the enlargement of the Saint-Urbain entrance, the refurbishment of the mezzanine floor, the construction of elevator shafts as well as the refurbishment of the station’s lighting.