PROJECTS
STM Atwater
Société de transport de Montréal (STM)
The work consisted in the renovation of the waterproofing membrane across Atwater station’s roof under rue Maisonneuve Ouest, the structural work for the addition of two elevator shafts and the redevelopment of premises at the open station.
Compétence 2000
Commission scolaire de Laval (CSDL)
The work consisted in building two 3-storey extensions in precast concrete as well as adding emergency exits for improved means of evacuation.
Construction of Jean-Talon and Jean-Drapeau installations
Société de transport de Montréal (STM)
Construction and redevelopment work required for the installation of an elevator at the Jean-Talon station and of two elevators at the Jean-Drapeau station.
Turcot Project
Ministère des transports du Québec (MTQ)
The work consisted in partially demolishing the building, recycling and transforming the existing building as well as other related work.
St-Luc School
Commission scolaire Marguerite-Bourgeoys (CSMB)
The work consisted in a 2-storey extension to the school, development of the grounds and the implementation of a geothermal system for the building’s mechanics.
OMHM Drolet
Office municipal d’habitation de Montréal (OMHM)
The work consisted in improving the outside appearance by completely redoing the brickwork, landscaping the building’s four sides and the architectural refurbishment of eight floors of common areas.
Place d’Armes
Société de transport de Montréal (STM)
The work consisted in waterproofing the station structure, the enlargement of the Saint-Urbain entrance, the refurbishment of the mezzanine floor, the construction of elevator shafts as well as the refurbishment of the station’s lighting.
UDM Salle Claude Champagne
Université de Montréal (UDM)
The work consisted in the refurbishment of the wooden wall veneer in the Faculty of Music building. The work was done within a very tight timeframe which left no margin for the unforeseen on the job site.
Place des Arts
Société québécoise d’infrastructure (SQI)
The work consisted in refurbishing the beams and supports for the installation of prefabricated slabs in the multi-level steps sector as well as finishing work including the addition of aluminium panel cladding, glass railings and stainless steel handrails.
Saint-Grégoire-le-Grand School
Centre de services scolaire de Montréal (CSSDM)
The extension and renovation of the St-Grégoire school consisted in adding a gymnasium, a library, a staff room, a multi-purpose room, offices, 7 classrooms as well as the redevelopment of the schoolyard.
Berri
Société de transport de Montréal (STM)
The work with partial closure consisted in the refurbishment of the Berri-UQAM station’s Sainte-Catherine and Saint-Denis entrances as well as the access corridors leading to the station’s mezzanine.